Sunday, 21 October 2012

2 days to go!!


2 days to go!!!

We started Tuesday off with a warm called Ninja which was another version of splat. We also played a game called chain tag which was not only great fun but helped with further team bonding and encouraged teamwork.

Then Paul talked with us for a few minutes a bit some Facebook post we should look at which was about Peter brook who is perceived as the ‘Greatest director’ http://www.youtube.com/watch?v=Sx2qHHFS5Yk

After this we went back into our RISK groups, we got straight into practicing our performance to see firstly how long the performance was because it and to be over 30mins also to see which parts needed the most work. After running the performance through properly I felt that scene 2 ‘the break up’ still wasn’t working as well as we had hoped so me and ZoĆ« decided that we should write a script out together from that scene to see if that helped to spark some connection. We also found that our performance was only 25 minutes but this wasn’t including an idea that Dannel came up with, which was to sing a song.
We then ran the performance again using the props we had such as flash cards and masks, this time however the scenes actual moved smoothly even mine and Zoe’s break up scene seemed to improve!! This was due to the script we wrote helped us to stay on track!!

After lunch we ran the play again because everyone felt we needed to keep running it so that we were best prepared as possible, people including myself were worried that we still hadn’t performed in the Hex theatre which is where we were going to perform it on the day!! After we had run it once more after lunch we concentrated on the music pieces we were going to use and deciding what our evaluation question was going to be and how we were going to do it!

Looking back on the day I think we made great progress, I think that the whole group was happy about their roles and the play as a whole!!

No comments:

Post a Comment